A terraced street at dusk with the road peeled open, revealing an x-ray cutaway of the buried services beneath

Welcome to the

Underground Intelligence Bureau

The Sygma way of locating buried services, declassified.

Genny first. Locate, then avoid.

Released a piece at a time: the courses, the videos, the handbook, and Agent Hertz, who has read the lot and answers with the clip it came from.

Things to watch and read
73Things to watch and read
Subjects, six groups
31Subjects, six groups
Handbook chapters
31Handbook chapters
ScrollGated · Work email · Sygma owned
The ground, openedFrom the handbook
External wall lantern with a red crocodile clip on its supply: using the lighting circuit at a property.
01
Genny connected at a property's service position, seen from above.
02
Earth pin and lead at the base of a stone wall, water bottle beside for wetting the earth.
03
Connection made inside an external meter box with the Genny beside it.
04
Red clip on an outside tap: using bonded metalwork as the connection point.
05
Genny at the corner of a house, meter box and downpipes on the wall above.
06
Start here

Start with street lighting.The cheapest first move you can make.

Mini Quick Course · 6 steps · ~15 min
Cutaway of a street at night: a lit column on the pavement, terraced houses behind, and a buried cable glowing orange where a signal has been applied

Street lighting teaches you the cheapest first move. This is the rest of it. There are four ways to get a signal onto a line, they are not equal, and the order matters: connect if you can, clamp if you cannot, couple onto it if there is nothing to open, and induce only when everything else is exhausted. Each one has a condition that has to be met before it works at all, and knowing that condition is the difference between tracing a cable and tracing your own optimism.

  1. 01Why any of this matters1 min
  2. 02Watch: the four ways in4:04
  3. 03Direct connection, and what a good earth is2 min
  4. 04The signal clamp, and the two things that stop it working2 min
  5. 05Watch: the clamp, in the session4:02
  6. 06Induction, and why it comes last3 min
  7. 07Watch: what induction will and will not do5:45
  8. 08Check yourself7 questions
Start the course
Recently added

Fresh out ofthe ground.

73 live in the library
Ask Hertz

It has readevery word in here.

Agent Hertz goes ahead and reports back. Every answer points at the clip and the timestamp it came from, so you can watch the bit that matters rather than take its word for it.

Live answer

On a concrete column I can’t get a connection. What now?

Wrap the lead around the column and use a capacitance technique. You are coupling the signal on rather than connecting to it. There is no tone change when you do this, so don’t stand there waiting for one.

[1] Direct Connection: Street Lighting, LV and Telecoms · from 1:47

The library

Six waysinto the ground.

31 subjects