Video · 1:29

Pre-Use Checks in the Field: Inspection and the Service Due Date

The visual inspection before the kit comes on, checking the service due date on the CAT display, and the checks that take a minute and are not optional.

Length

1:29

Added

2026-08-05

Transcript

Held, and searchable

Transcript

The whole recording in text, the same words Hertz answers from, so what you can watch you can also search and ask about.

0:07Prior to using your CAT and Genny, a visual inspection should be carried out to ensure there's no visible damage and the equipment is fit for purpose and is inside its service due date. Now we have carried out the visual checks. We need to carry out battery checks on both cat and Genny. Place the Genny on the ground. Press the on button. If there is no sound or the battery warning light flashes, replace the batteries in a gas-free atmosphere. To check the batteries for the CAT, switch the CAT on by squeezing the trigger, checking for an initial chir. A low tone indicates low batteries. If there's no sound, replace the batteries

0:46in a gas-free location. You also need to check the service due date via the CAT display. To do this, squeeze the trigger. The screen will illuminate. Press the depth button and hold. The screen will display the day, month, and year when the service is due. However, within 31 days of the service due date, the word cal will flash on the display and the number of days left before the service due date. The function check should be carried out before use. Make sure the Genny is not placed over any utilities when carrying out the function check. Set the CAT to Genny mode at maximum sensitivity. Hold

Filed under