
The kit
Pre-use checks
7 things filed against this subject, in every format the Bureau holds.
Videos
Video
Checking and Turning Off StrikeAlert on a CAT4
How to see whether StrikeAlert is switched on, and how to turn it off.
Watch 0:27 →Video
Pre-Use Checks in the Field: Inspection and the Service Due Date
The visual inspection before the kit comes on, checking the service due date on the CAT display, and the checks that take a minute and are not optional.
Watch 1:29 →Video
Genny and CAT Training: The Full Run-Through
The whole method end to end in under ten minutes: pre-use checks, applying a signal, locating, pinpointing and taking a depth reading.
Watch 9:40 →