Applying a signal

Earthing

11 things filed against this subject, in every format the Bureau holds.

Videos
Video

Earthing, Clamping, and the Limits of Induction

Where the earth goes and why it matters, connection angles at 45 and 90 degrees, double ended connections, and an honest account of what induction will and will not do for you.

Watch 1:26:46
Video

Where to Earth the Genny Near a Lighting Column

Where the earth lead goes when you are connected at a lighting column, and what happens to the signal when it goes in the wrong place.

Watch 2:07
Video

Connection Angles and Where the Earth Goes

Connection geometry: at 90 degrees half the signal goes each way. Angling the connection and the earth toward the target changes what you get.

Watch 2:53
Video

The Earth Spike, the Signal Clamp, and the Appliance Safety Check

The earth spike making the CAT more accurate, the signal clamp around a pipe or cable, and the safety check with the customer first.

Watch 1:22
Video

Earthing the Genny: Close, Not Far

Where the earth pin actually goes: close to the column, not metres away. The myth, the demonstration, and water as an earth when there is no soft ground.

Watch 2:59
Video

Direct Connection: Street Lighting, LV and Telecoms

Setting up and earthing the Genny4, connecting at a lighting column, what to do when the column is concrete, gas risers, and the approvals you need before a telecoms lid comes up.

Watch 6:06
Video

Getting the Best Out of Your Genny and CAT

The full webinar. Signal application from first principles: why you start with street lighting, the two ways lighting is wired, dual frequency, earthing the transmitter, induction against direct connection, and where the signal actually goes once you have applied it.

Watch 1:12:19